Application Of Green Technology In Perhentian Island Water Supply Scheme
|
|
Anonymous writes "y: Ir.Dr.Hasnul b.Mohamad Salleh, MIEM, P.Eng. ; Ir.Lim Soon Guan, MIEM, P.Eng.
Introduction
The project was implemented by the Water Supply Department, Ministry of Energy, Green Technology and Water (MEGTW) in year 2006. Sumai Engineering Sdn. Bhd. and Summit Baruliman Sdn. Bhd. Joint Venture, and HLA Associates Sdn. Bhd. were appointed as the Contractor and Engineering Consultant for the project respectively.
The project is located in Besut District of Terengganu State. The project sites are located at the mainland and Perhentian Island of Terengganu as shown in Figure 1.1.
Perhentian Island consists of two islands by the names of Perhentian Kecil Island and Perhentian Besar Island. "
|
NOTIS GANGGUAN BEKALAN AIR
|
|
| DAAERAH |
KAWASAN TERLIBAT |
TARIKH |
MASA |
SEBAB-SEBAB |
| HULU TERENGGANU |
Kg Dura dan sekitarnya. |
16.3.2010 (Selasa) |
9.00 pagi hingga 6.00 petang |
Kerja-kerja penyambungan bekalan air baru BALB di kg Dura, Jenagor Daerah Hulu Terengganu |
| |
Kg Hulu Lerek dan sekitarnya. |
16.3.2010 (Selasa) |
9.00 pagi hingga 6.00 petang |
Kerja-kerja penyambungan bekalan air baru BALB di kg Hulu Lerek, Bukit Diman daerah Hulu Terengganu |
|
| SETIU |
Sekitar Perkampungan Jelapang. |
16.3.2010 (Selasa) |
9.00 pagi hingga 5.00 petang |
Kerja-kerja penyambungan paip bari di kg.Mak Jintan Jelapang, Setiu. |
|
| DUNGUN |
-TIADA- |
|
|
|
|
| KUALA TERENGGANU |
-TIADA- |
|
|
|
|
| KETENGAH |
-TIADA- |
|
|
|
|
| KEMAMAN |
-TIADA- |
|
|
|
|
| BESUT |
-TIADA- |
|
|
|
|
| MARANG |
-TIADA- |
|
|
|
|
|
|  | |
|